Multi-Chain Crypto Drainer

Quark Drainer by Quarklab

Drains tokens, staking, LP positions, and NFTs in one click across EVM, Solana, TRON, and XRP. Connects 500+ wallets with no red screens. 100% payouts straight to your wallet with 0% fees.

Volume
$900M+
Users
200+
Wallets
500+

Features

Smart Contracts

Clean, private smart contracts deployed directly to your address. No shared proxy contracts that get blacklisted in 24 hours, and 0% DaaS skims on every transfer.

Crypto Drainer Templates - 400+ Web3 Phishing & Airdrop Landers
  • Clean contracts with no red screens on MetaMask, Rabby, and Phantom
  • Full obfuscation against crawler bots
  • Bypasses Blockaid, Blowfish, and MetaMask
  • Clean contract fingerprint
  • Private logic not indexed by security crawlers

Supported wallets

Supports 500+ wallets on iOS, Android, Windows, and macOS with native deep-links for mobile apps (Face ID / Touch ID) + browser extensions and hardware signers via WalletConnect v2: MetaMask, Trust Wallet, Coinbase, Exodus, Phantom, Bybit, Binance, Solflare, TronLink, SafePal, Ledger, and more…

MetaMask Wallet Drainer Phantom Wallet Drainer Coinbase Wallet Drainer Trust Wallet Drainer Exodus Wallet Drainer Bybit Web3 Wallet Drainer Binance Web3 Wallet Drainer Solflare Wallet Drainer SafePal Wallet Drainer
Documentation

Withdrawal Methods

Supported assets: Native coins, tokens and NFTs. Drains most valuable funds first (ETH, USDT, USDC, BNB, DAI, SOL, XRP, SHIBA, TRX, and many more).

Tokens and Balances:
Permit2, Multicall batching, Sign, Transfer, Approve, Uniswap, PancakeSwap, Curve, Aerodrome, and SushiSwap routing.

NFTs and Marketplaces:
SetApprovalForAll, SeaPort 1.6 and Blur private routes for high-floor NFTs.

Flow

STEP 1

High-Converting Landers

High-converting custom interfaces.

Users connect their wallet (MetaMask, Phantom, TronLink, Trust Wallet, etc.). This grants the script access to their assets.

Direct mobile deep-links open MetaMask, Trust Wallet, or Phantom instantly on iOS and Android with Face ID.

Web3 Wallet Drainer Modal - MetaMask, Trust Wallet, Phantom Connect
STEP 2

Multi-Wallet Connection

Clicking “Connect Wallet” brings up the multi-provider modal. Mobile users route via universal deep-links directly into their wallet app.

Full support for 500+ wallets across EVM, Solana, TRON, and XRP - including MetaMask, Trust Wallet, Phantom, Uniswap Wallet, and Ledger.

Multi-Wallet Connection Modal - MetaMask, Phantom, Trust Wallet
STEP 3

Instant Transfer and Telegram Alert

Once approved, the drainer script transfers wallet assets in a single transaction via Multicall or Permit2 batch transfers:

  • Native coins and tokens (ETH, SOL, BNB, USDT) transferred directly to your payout address;
  • Automatic TRX gas top-up to cover network fees on empty TRON wallets;
  • NFT drain via marketplace approvals (SeaPort, Blur).

Each successful drain instantly sends a detailed hit notification to your private Telegram channel with user balance, network, IP, and location data.

Crypto Drainer VPS Setup & Node.js Deployment Script
STEP 4

Mobile Deep-Links and Fast Signatures

Real-time mobile wallet interaction.

Deep-links launch the mobile wallet directly. Biometric authentication (Face ID / Touch ID) confirms the batch transaction instantly.

Real-time Telegram notifications ping your private channel the millisecond signatures are confirmed on-chain.

30+ Connection Modals

Chains and Tokens

Ethereum ETH Drainer NetworkETH
Solana SOL Drainer NetworkSolana
BNB Chain BSC Drainer NetworkBNB
XRP Ledger XRPL Drainer NetworkXRP
TON The Open Network DrainerTON
TRON TRX Drainer NetworkTRX
Avalanche AVAX Drainer NetworkAVAX
Polygon MATIC Drainer NetworkPolygon
USDT TRC20 and ERC20 Drainer TokenUSDT
USDC Stablecoin Drainer TokenUSDC
DAI Stablecoin Drainer TokenDAI
WBTC Wrapped Bitcoin DrainerWBTC
Base L2 EVM Drainer NetworkBase
Arbitrum One ARB Drainer NetworkArbitrum
Optimism OP Drainer NetworkOptimism
Blast L2 Drainer NetworkBlast
zkSync Era Drainer NetworkzkSync
Linea zkEVM Drainer NetworkLinea
Scroll zkEVM Drainer NetworkScroll
Unichain DeFi Drainer NetworkUnichain
Ink Blockchain Drainer NetworkInk
Sui Network DrainerSui
Aptos Network DrainerAptos
Berachain EVM Drainer NetworkBerachain
Monad EVM Drainer NetworkMonad
Hyperliquid L1 DrainerHyperliquid
Pepe PEPE Memecoin DrainerPEPE
dogwifhat WIF Solana Memecoin DrainerWIF
Bonk BONK Solana Memecoin DrainerBONK
Dogecoin DOGE Drainer TokenDOGE
Shiba Inu SHIB DrainerSHIB
Jupiter JUP Solana DrainerJupiter
Uniswap UNI Drainer TokenUniswap
QUARK PANEL

All-In-One Dashboard

Manage domains, drainer settings, cloaking, and see stats in one place

Launch Panel
Crypto Drainer Admin Panel Dashboard - Quark Drainer

400+ Ready-Made Pages

Choose your offer and deploy website in minutes

Trust Wallet Drainer Template - Security Verification Lander
Airdrop Drainer Template - Web3 Token Claim Lander
Crypto.com Wallet Drainer Template - DeFi Staking Lander
NFT Drainer Template - Whitelist Mint Lander
AML KYC Drainer Template - Wallet Verification Lander
TRON Drainer Template - TRX & USDT TRC20 Airdrop Lander
Explore more designs

Pricing

QUARK DRAINER

90+ Chains

Full support for EVM (ETH, BNB, ARB, OPT, BASE, POLY, AVAX, USDT), Solana, TRX, and XRP Ledger. Drains coins, tokens, and NFTs

500+ Wallets

MetaMask, Trust Wallet, Phantom, Coinbase, Ledger Live, Safe, Rabby, Backpack, TronLink, Xaman, and all WalletConnect

400+ Landers

High-converting cloned landers, airdrop portals, DEX interfaces, NFT mints, and security check pages

Private Chat

Invite to the closed Telegram group

Full Source Code
Frontend, backend, and smart contracts
Admin Panel
Logs, domain routing, teams, and cloaking
Selfhost
Self-hosted deployment with zero external reliance
ONE-TIME PAYMENT
$ 5,000
Lifetime Access
Get 100% of drained crypto
No hidden fees
Free updates
Quick deployment
I HAVE QUESTIONS

Frequently Asked Questions

Answers to common questions about setup, bypasses, payouts, and running campaigns.

READ MORE IN DOCUMENTATION

A crypto drainer is client software that lets connected Web3 users approve a transaction (like a reward claim, mint, or verification) that automatically routes wallet tokens, LP positions, and native coins straight to your payout address with no seed phrases needed.

Quark Drainer works across EVM, Solana, TRON, and Web3 landers using private contracts and client scripts with no red screens and zero middleman fees.

Click “Purchase” on the website, you’ll be redirected to the admin panel at account.quarkdrainer.cc

  1. Register an account
  2. After login, select Quark Drainer
  3. Complete payment via BTC / ETH / LTC / XMR

Once confirmed, your account gains full access to the backend, frontend templates, smart contracts, private chat link, and setup guides.

Yes. You can inject the script directly into your existing frontend.

After integration:

  • All approvals and withdrawals appear in real time
  • Full control via admin panel
  • Works with any EVM, Solana, XRP, or TRON-based site

Alternatively, upload your design through the panel and host it securely.

All managed from one place.

Yes. After purchase, you’ll receive the full stack:

  • Backend
  • Frontend
  • Smart contracts
  • Admin panel

Deploy it on any VPS or hosting with Node.js support.

Detailed setup guide included with technical support available in the private group.

Quark Drainer package includes:

Full Stack: Backend, frontend, smart contracts
Setup Guide: Step-by-step instructions + video walkthrough
400+ Ready-Made Landers: Exchange interfaces, token claim pages, and staking dApps
Anti-Bot Filters and Cloaking: Bypass crawlers, Blockaid, and Blowfish
Telegram Notifications: Live alerts for every connect and withdraw
Cross-Device Compatibility: Mobile and desktop support
Private Community Access: Group of 200+ users
Rapid Updates: Patches released within hours of new detection rules

Yes - natively.

When a user connects their wallet from a phone:

  • They’re redirected directly to their app (Trust Wallet, Phantom, Coinbase)
  • Biometric authentication (Face ID / Touch ID) is triggered
  • A connection modal prompts for approval, matching standard dApp behavior

Drain starts instantly - usually within seconds.

Auto-withdraw mode executes transfers immediately.
Delayed withdrawal option available for lower suspicion.

Average execution time: under 10 seconds across EVM, Solana, XRP, and TRON.

Not unless they manually check their balance or transaction history.

There are:

  • No MetaMask/Phantom warnings (bypassed)
  • No outgoing transfer alerts
  • No visible signs in most cases

One approval = long-term access.

If the user tops up months later - you’ll see it in your logs and can withdraw funds manually or automatically.

Yes. All buyers get:

  • Access to a private chat with 200+ users
  • Live Telegram support
  • Case studies, traffic guides, manuals
  • Rapid updates when detection systems change

Public scripts get blacklisted by Blockaid and Blowfish within hours.

Quark maintains active uptime through:

  • Private scripts not indexed by security crawlers
  • 500+ wallets supported across mobile and desktop
  • 90+ chains: EVM, Solana, XRP, TRON, and L2s
  • One-signature withdrawals via multicall
  • Real-time Telegram alerts
  • Team permissions and delayed execution options

Maintained for teams requiring private contract signatures and delayed withdrawal logic.

Quark Drainer supports over 90+ blockchains, including:

EVM: Ethereum, BSC, Polygon, zkSync Era, Scroll, Mantle, Linea, Optimism, Arbitrum (explore EVM drainer features)
Solana: Phantom, Solflare, Trust Wallet (explore Solana drainer features)
TRON: TronLink, TokenPocket, BitKeep (explore TRON drainer features)
JavaScript & Web3: Universal client script for custom landers (explore JS drainer setup)
XRP Ledger: Xaman, Xumm
Cross-chain support: Avalanche, Fantom, Aurora, Ronin, Base, Celo, Klaytn, PulseChain, Dogechain, and many others

Over 500+ wallets, including:

  • MetaMask
  • Trust Wallet
  • Coinbase
  • Phantom
  • Solflare
  • TronLink
  • WalletConnect v2
  • Backpack
  • Safe
  • And hundreds more

Compatible with mobile, browser extensions, and hardware wallets via WalletConnect v2.

Yes.

Choose from 400+ pre-built templates mimicking real services:

  • Binance
  • Coinbase
  • OpenSea
  • Uniswap
  • PancakeSwap
  • And more

Or upload your own design directly in the panel.

Payments are handled through the quark panel. After payment, you gain instant access to the full package - including all files, setup manual, guides, and everything needed to run your campaigns.

Just follow the instructions and deploy it securely.

Get Access to the Quark Drainer

90+ blockchains, 500+ wallets, 400+ pre-built landers. Lifetime access.