Multi-Chain EVM Drainer - ETH, BSC, Arbitrum, Base, Polygon Support EVM Drainer Analytics and Wallet Balance Tracker Buy Crypto Drainer - Multi-Chain License and Source Code
QUARK DRAINER

Quark EVM Drainer

90+ Chains. 500+ Wallets. Fast Approvals.
Ethereum, Arbitrum, Base, Blast, zkSync, BSC, Polygon

Drains staked ETH, ERC-20 tokens, and LP positions via Permit2 and multicall in one signature.

How EVM Drainer Works

Connect Wallet

Users see a modal window where they connect their Ethereum wallet (MetaMask, Trust Wallet, Coinbase Wallet, Rabby, or Trezor). This grants the script access to their assets.

EVM Drainer Script - Permit2 and Seaport Batch Approvals
Permit2 Drainer - Uniswap Permit2 Batch Approval Signature Bypass

Asset Scan and Clean Approval

Once connected, the script checks wallet balances in under a second, ranking ETH, stablecoins (USDT, USDC), DeFi positions, and high-floor NFTs so the most valuable assets transfer on the first signature.

Clean Signature Execution

The user signs a routine claim or verification prompt (Permit2 or Seaport). Includes fake transaction previews displaying incoming ETH or reward tokens, ensuring users approve without suspicion or red warning screens.

EVM Multicall Drainer - Batch Token & NFT Script
EVM Drainer Payload Builder - Calldata Obfuscation & Blockaid Bypass

Real-Time Notifications

The second a transaction confirms on-chain, you get an instant Telegram alert showing the wallet address, asset, dollar value, and tx hash.

Full wallet draining - from staked ETH to NFT LP positions

Drain Every Layer of the Wallet

DEFI VAULTS AND LENDING
  • AAVE v2 / v3
  • Venus, Radiant, Spark
  • EigenLayer (restaked ETH)
  • Prisma Finance
  • MakerDAO Vaults
  • ApeStake (APE + NFTs)
  • LayerBank, Granary
  • Morpho Blue
DEX AND LP POSITIONS
  • Uniswap V2 / V3
  • PancakeSwap, SushiSwap
  • Curve.fi + Convex
  • Trader Joe (ERC1155 LPs)
  • Camelot V2 LPs
  • Velodrome / Aerodrome
  • Stargate, Frax LPs
  • Beefy Finance Vaults
NFTS AND COLLECTIBLES
  • Blur Marketplace and Pools
  • OpenSea and Seaport Collections
  • ERC721 High-Floor NFTs
  • ERC1155 Multi-Token Assets
  • ERC404 Hybrid Tokens
  • Wrapped NFT Liquidity
  • Instant Floor-Price Priority
  • Direct Transfer to Cold Wallet

Works across 250+ EVM Wallets

MetaMask, Rabby, Trust Wallet, Coinbase Wallet, OKX Wallet, Bitget Wallet, SafePal, TokenPocket, Zerion, Rainbow, 1inch Wallet, imToken, Exodus, Safe, Ledger, Trezor, Keystone, and hundreds more via WalletConnect v2.

Key Features

Instant Multi-Chain Drain

No more manual switching between networks. The drainer detects all EVM chains where the user holds assets - Ethereum, Arbitrum, Base, Blast, zkSync, and 50+ others - and executes parallel draining transactions in a single session. Staked ETH on EigenLayer, LP tokens on Uniswap V3, Native yield on Blast.

Clean Approval Prompts

Wallets like MetaMask and Rabby flag sudden unverified transfers. Quark uses dynamic proxy contracts, split transaction logic, and Permit2 signatures so users see standard, familiar approval prompts. Clean contract calldata prevents warning popups from interrupting conversions.

Real-Time Dashboard

Track every hit in live time:

  • User’s wallet address and device type
  • Chains drained and asset breakdown (ETH, USDC, NFTs, LPs)
  • Estimated USD value per hit
  • Traffic source (UTM tracking)

Auto-Convert to ETH

Why keep 20 random tokens? Our built-in DEX aggregator instantly swaps all drained assets to ETH or WETH at the best available rate. All transactions use dynamic gas pricing for fast, predictable execution. You receive clean ETH.

Deploy the most effective EVM Drainer in 2026

Quark Drainer is the only tool that automatically drains assets across 90+ chains from MetaMask, Trust Wallet, Coinbase, and all “Wallet Connect” wallets

Includes 400+ ready-made landers, silent multi-asset execution, real-time Telegram alerts, and 24/7 support

Price: $5,000

Purchase Quark Drainer

Frequently Asked Questions

Common questions about Permit2, multichain support, zero gas signatures, and payouts.

READ MORE IN DOCUMENTATION

Yes - and this is where the real profit is. We drain:

  • EigenLayer restaked ETH and eTokens
  • Blast native yield (auto-claimed)
  • AAVE v3 collateral (even if borrowed against)
  • Convex and Curve LP + gauge rewards
  • Prisma and Spark vault positions

The drainer doesn’t just take liquid tokens - it drains every staked, LP, and yield position the wallet has approved.

Absolutely. You get a single JS snippet (under 10KB) that you inject into any HTML page - your airdrop site, verification portal, or NFT mint. The script loads silently, connects to our drainer, and activates on wallet interaction. Full control over design, copy, and UX.

Permit2 allows users to sign an off-chain message covering multiple tokens at once with zero gas fees. Because Permit2 is Uniswap's universal verified contract across all EVM chains, MetaMask and Rabby treat the signature as a safe, ordinary prompt with no red warning popups. Once signed, your backend relayer executes the transfer on-chain in the same block.

Over 85% on Phantom, MetaMask, and Coinbase Wallet - even with Blockaid or wallet security warnings enabled. We use:

  • Sponsored transaction previews (“You’ll receive 0.2 ETH”)
  • Instant execution immediately after signature
  • Contract obfuscation (no known malicious addresses)

Most users don’t read popups - and security plugins often miss novel payloads.

Yes. Set a different ETH address for each domain or traffic source via our dashboard. Use burner wallets, Tornado Cash deposits, or multi-sig vaults. Addresses can be updated in real time - no redeployment needed.

Fully. We drain:

  • ERC721 (BAYC, Azuki, Pudgy)
  • ERC1155 (Sandbox, Gods Unchained, Trader Joe LPs)
  • ERC404 (hybrid tokens like Pandora)
  • Blur Points and Seaport listings

NFTs are either sent directly to your wallet or auto-listed on Blur for instant liquidity.

Typically 2-4 seconds from signature to final ETH in your wallet. The process:

  • User approves standard claim prompt
  • Permit2 approval + native token drain (0.5s)
  • LP/DeFi position unwrapping (1-2s)
  • Swap to ETH (1s)

Automated execution routes directly to your payout address with zero manual delays.

Yes. The dashboard supports unlimited campaigns. Track performance per:

  • Domain
  • Traffic source
  • Geo (via IP detection)

Each campaign can have its own frontend, payout address, and Telegram alert rules.

Most “drainers” are basic ERC20 scrapers. Ours is a full-stack DeFi drainer:

  • Drains 50+ protocols, not just tokens
  • Bypasses wallet security plugins
  • Includes auto-convert and analytics
  • Updated weekly for new protocols
  • 24/7 support